Tuesday, June 30, 2009
Monday, June 29, 2009
Inspection Defection
We finally got our green tag for our framing last week! The inspector was a jack ass, at best. He kept red tagging us- not because he wasn't satisfied with the work, but because he "could hear hammering inside, so we must not be ready for inspection," etc. Grrr.
Sent via BlackBerry by AT&T
Sent via BlackBerry by AT&T
Friday, June 26, 2009
Wednesday, June 24, 2009
Tuesday, June 23, 2009
I Love Dry Wall
Wood flooring stacked to right is what's left to be installed in the downstairs guest room and hallway.
Standing inside guest room looking back at the room with no name...

Guest bedroom on Sunday-
Same wall on Tuesday. Dry wall rocks.
Guest room on Sunday...
Guest room on Tuesday! Closet door on left, door into bathroom (with green wet rock visible), and door on right goes to hallway.
Plan to install built in bookcase to left of window, desk underneath window, and (obviously) have closet on right. Window looks into backyard.
Guest room has 2 other windows, too. Almost failed inspection because they are more than 40" off floor, but for some reason, he let it go. Maybe since they're old and that's where they originally were?
Downstairs bathroom on Sunday....
Bathroom on Tuesday. Loving the stained glass. SO glad we didn't build a bathroom without a window. Since it is a first floor bathroom, we elevated the window and chose one with opaque glass.
We only put 1 full bath in downstairs, rather than trying to cram in a full bath and a half bath. We don't have overnight guests THAT often, so we figured everyone can share.
Fancy water panel above. Doorway to left leads into guest bedroom.
Standing inside guest room looking back at the room with no name...
Guest bedroom on Sunday-
Guest room on Tuesday! Closet door on left, door into bathroom (with green wet rock visible), and door on right goes to hallway.
Downstairs bathroom on Sunday....
Now about the upstairs....
Subscribe to:
Comments (Atom)